SPML had recognized the importance of Smart City almost three decades ago, when it started building urban infrastructure for the future. The broad understanding of the Smart City requirement enables SPML to anticipate new trends and develop new infrastructure and technologies faster than others.
SPML has been a pioneer in water, wastewater, sanitation, energy and infrastructure initiatives and is working on IT enabled integrated water management & distribution system, smart power transmission and distribution network, wastewater treatment and re-use, integrated municipal solid waste management & waste to energy, modern sewerage network, effective asset monitoring & performance system, interactive consumer complaints management system, mobile applications for consumer self-services among others.
Flagship Project: Vikram Udyogpuri Smart City, Ujjain
SPML Infra is developing smart infrastructure for Vikram Udyogpuri, an early bird project under the Delhi-Mumbai Industrial Corridor (DMIC), part of the Pithampur-Dhar-Mhow Investment Region in Madhya Pradesh. Awarded by Vikram Udyogpuri Limited, a Government of Madhya Pradesh enterprise, the project is being executed in joint venture with Om Metal Infraprojects.
The site covers 1,100 acres, located about 8 km from Ujjain and 12 km from Dewas. SPML is delivering the project on a Design Build Operate (DBO) basis: three years of construction followed by five years of operations and maintenance.
Project at a glance:
Client | Vikram Udyogpuri Limited (Govt. of MP Enterprise) |
Project value | Rs. 325 Crore |
Site area | 1,100 acres |
Construction period | 3 years |
O&M period | 5 years |
Delivery model | Design Build Operate (DBO) |
Scope of Work
Water Infrastructure
- 10 MLD water treatment plant
- 11.10 km raw water transmission line
- 3,500 KL clear water and 1,000 & 2,500 KL recycled water reservoirs
- 10.80 MLD raw and clear water pumping station
- 17.7 km drinking water distribution network
- 1,600 KL capacity overhead tank
- Rainwater harvesting works, including deepening of three existing ponds and construction of a new earthen pond
Wastewater Infrastructure
- 5.2 MLD tertiary treatment plant on SBR technology
- 2.1 MLD tertiary treatment plant on MBBR technology
- 26.3 MLD sewage pumping stations
- 7 MLD recycled water pumping station
- 16.7 km HDPE network for wastewater collection
- 16.04 km storm water drainage system
Power Infrastructure
- 33 kV compact substations with complete electrical installations
- 11 km of street lighting with LED fixtures and high-mast systems
Civil Infrastructure
- 17.1 km of 4-lane and 6-lane roads with service roads, culverts and bridges
- Real time traffic management system
- Domestic gas distribution network with RCC utility trench
- Fire station with underground tank and fire tender vehicles
- Administration building with an ICT control centre
- 36 km boundary wall
Sanitation
- 10 TPD compost plant with complete solid waste management, from collection through final disposal
Information & Communication Technology
- SCADA and PLC systems
- Centralized command and control centre
- CCTV network with centralized monitoring and storage
- Fibre optic connectivity to individual plots