| Scope and Project Component |
| A 4.5 MW project, located in Kanga district |
|
- BOO Basis - Design, Construction, Operation
- Project Capacity – 4.5 MW, Annual Generation – 20.55 MU
- Estimated that on 75% dependability with 95% plant availability, an average of 20.55 million units of
hydroelectric power will be generated every year
- Project on the southern slope of Dauladhar range is at an altitude of 1458 m above sea level
|
| |
|
|
| Project Highlights |
| |
| Employment to the local populace (surrounding villages such as Saperu etc.) |
| |