|
|
| Awards/Accolades |
| |
|
 |
Mr. Anil Sethi, Chairman, SPML conferred Outstanding Entrepreneur Award - Asia Pacific – 2009, by Enterprise Asia |
|
 |
SPML conferred as the fastest emerging Infrastructure company (Large Category) for the year – 2008-09,at the 7th Construction World Annual Awards 2009 presented by the chief guest Shri Kamal Nath, Hon’ble Union Minister for Road Transport and Highways. |
|
 |
SPML, Ranked 104 - Best Performing 500 Mid-Sized Companies in India
Inc. India |
|
 |
Rank 189 up from Rank 329 in the Top Business Companies List
Business India |
|
 |
Excellence in Project Management in Hydro Power Sector (SHP) from ENERTIA Publication as part of their Annual ENERTIA Awards 2008. The award is in the category for sustainable Energy & Power, for the development and efficient operation of the 20 MW (10 MW x 2) Kabini Hydro Power Project, the 2nd largest private sector mini hydel scheme in the Karnataka. |
|
 |
Economic Times 500 (Year 2008) – one of most respected business publication’s ET Survey of 500 biggest organizations in India ranks SPML at 338, a clear jump of 46 positions from the previous year standing of 384 |
|
 |
Ranked at 312 amongst India’s 1000 corporate giants based on Net Sales- by eminent financial magazine “Business Standard” Year 2008 |
|
 |
SPML - awarded as the Number One fastest growing construction companies in India in ‘large category’ , the award was presented by Dr. T. Subbarami Reddy, Union Minister for States (Mines) - 30.10.2007, Ceremony of “Fifth Construction World – NICMAR Award 2007 |
|
 |
One of the top 500 companies in India - “Dun & Bradstreet” & “The Financial Express” – Year 2007 |
|
 |
Promoters - Ranked at 217 amongst top Billionaires of the country by eminent financial magazine “Business Standard” - Year 2007 |
|
 |
The Government of Karnataka, Department of Energy and Karnataka Renewable Energy Development Limited certified Subhash Kabini Power Corporation Ltd (a subsidiary of SPML) and awarded second for highest capacity installation in small hydro power projects for/during the period 1996-2004 |
|
|
 |
|
| |
| |
SPML Project Highlights (Indicative List)
- SPML set up the world’s highest single-stage pumping station at Lunglei in Mizoram
- India’s first integrated management contract from source to tap for Latur Water supply Scheme & Integrated Bulk Water supply and water management for Bhiwandi Nizampur City Municipal Corporation, have been SPML’s flagship projects in integrated water supply management initiatives on a PPP basis. These ventures has created a ripple effect with new initiatives in other cities across India.
- Through it’s Treated Water Transmission Mains Project (JBIC funded ), SPML, facilitated drinking water to about 10 lakh people spread over 40 villages in Kerala. The project is JBIC (Japan Bank for International Co-operation) funded and has been secured in International Competitive Bid (ICB).
- SPML is credited to have undertaken the maximum number of 40 projects from Karnataka Power Transmission Corporation Limited in the financial year 2007-2008.
- SPML is also credited with commissioning of maximum number of 110/66 kV sub-stations by single Turnkey Contractor in Dec 2007 & Mar 2008 respectively, in Karnataka.
- SPML executed Central Government aided biggest APDRP project ever in India till date (U.G. Package in terms of quantity of cable laid and value of Contract Order under Execution of “Accelerated Power Development and Reforms Programme (APDRP) Works”)
- SPML executed Yelahanka Primary/Tertiary Sewage Plant - the First Ever Tertiary Sewage Treatment Plant of it’s kind in India for the reuse of Municipal Waste Water contributing to the environment protection and for a cleaner/better community.
- SPML laid 2050mm diameter pipes @ 1km/day, while implementing it’s Saurashtra Pipeline Project. The main objective of the project was to transfer the excess water from the southern region of Gujarat to the drought prone areas of Saurashtra.
- SPML participated' Tirupati Water Supply Scheme was commissioned in a record 97 days.
- SPML undertaken Plant Water Supply Package – Bakreshwar Thermal Power Plant, West Bengal, completed the Project in April 1999, three months ahead of schedule. This was an OECF, Japan Funded Project.
Mr. Anil Sethi, Chairman, SPML
- The Vikas Jyothi Award
- The Pride of India Gold Star Award
- India Quality Gold Star Award, among others
Mr. Subhash Sethi, Vice Chairman, SPML
- The Gem of India Award
- ICME’s Award for Management 1994
- The Melvin Jones Award
- The National Integration Award, among others
Mr. Sushil Sethi, Managing Director, SPML Integral member:
- National Council of Federation
- Indian Society of Trenchless Technology
- PHD Chamber of Commerce & Industry (PHDCCI)
- Construction Federation of India
|
|
|
| DOWNLOADS |
 |
|
|
|
|
| |
|
|
| Back to the top |
|
|
|
|